Workforce Skills Support Logo
£0.00 0

Basket

No products in the basket.

CITB Funding update

If you are CITB levy-registered, you can benefit from being part of an Employer Network or accessing the CITB Skills and Training fund

  • Employer Networks - This NVQ can be 70% funded under Employer Network
  • CITB Skills and Training Fund - Cost neutral utilising the CITB skills and training fund and CITB short qualification grant

Speak to our friendly team to find out more.

NVQ

Level 2 NVQ Diploma
Groundworks - Construction Operations and Civil Engineering

Candidates need to be experienced and have sufficient knowledge to complete the assessment and carrying out the specific Construction and Civil Engineering works specific for the preferred pathway(s).
Home » Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services – Construction Operations (Construction) – (Con Ops, Groundworks, Groundworker)
Qualification information

Level 2 NVQ Diploma
Construction Operations & Civil Engineering Operations (Construction)

About This Qualification

Qualification title
ProQual Level 2 NVQ Diploma in Construction Operations and Civil Engineering Services—Construction Operations (Construction)

Occupation
Groundworks

The Construction operations and Civil engineering NVQ is specifically for Groundworks and for those working in this industry who want to prove their competence, This covers drainage, aspects of concreting, kerbs, paving, excavation and reinstatement.

Groundworks-Construction-Operations-and-Civil-Engineering-NVQ

Eligible For Grant & Funding

This NVQ is eligible to claim the CITB Short Qualification Grant. If you are a CITB-registered employer and up-to-date with your Levy returns, then £600 can be claimed upon completion of the NVQ.
On this page

Duration: 2 to 3 visits

Location: On-site assessment and/or remote

Cost: Price on calling

Dates: On-site assessment

Accreditation: OFQUAL Certification

Occupation: Construction Operations Kerb & Channel Layer, Construction Operations Drainage Construction, Construction Operations Structural Concrete, Highways Maintenance Concreting, Groundworker, Construction Operative Excavation & Reinstatement, Maintenance Operative

%

Success Rate

+

Delegates completed their NVQs with us in 2024

£

Eligible for CITB Short Qualification Grant

Qualification Structure

Mandatory Units
Candidates must complete all mandatory units.
Unit Ref.TitleLevel
J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace.

Unit Endorsements:

One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    R/651/0010Laying modular pavement in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Block paving
  • Brick paving
  • Stone/Concrete setts
  • Flags
  • Natural stone rough cut
  • Natural stone uniformly cut
  • 2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    K/508/6536Setting out secondary dimensional work control in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Lines
  • Levels
  • Depths
  • Areas
  • Heights
  • Angles
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2

    Mandatory Units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    F/651/0015Laying preformed kerbs and channels in the workplace2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    K/508/6536Setting out secondary dimensional work control in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Lines
  • Levels
  • Depths
  • Areas
  • Heights
  • Angles
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2

    Mandatory Units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    T/650/8908Installing, maintaining and removing temporary excavation support in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • A proprietary system
  • Open and closed support systems
  • Piling systems
  • Bespoke support systems
  • 2
    K/508/6536Setting out secondary dimensional work control in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Lines
  • Levels
  • Depths
  • Areas
  • Heights
  • Angles
  • 2
    H/651/0016Installing drainage in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Inspection chambers
  • Surface water systems
  • Foul water systems
  • Surround pipe with specified materials
  • Place backfill to trench using given work instructions for both compacted and free drainage materials
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2

    Mandatory Units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    D/615/4986Placing and compacting concrete in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Chute
  • Elephant’s Trunk
  • Skip
  • Pump
  • Mono-rail
  • Manually
  • 2
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2
    Optional Units
    Candidates must complete one unit.
    Unit Ref.TitleLevel
    K/650/8913Preparing, mixing and distributing concrete and mortars in the workplace1
    K/651/0027Reinstating ground condition in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Backfill (excavated materials)
  • Backfill (new materials)
  • Compact
  • Hard top surfaces
  • Cultivated and grassed areas
  • 2
    D/600/8281Erecting and dismantling access/working platforms in the workplace


    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)


  • Plus two or more of the following:

  • Ladders/crawler boards
  • Step ladders/platform steps
  • Proprietary towers
  • Trestle platforms
  • Mobile scaffold towers
  • Proprietary staging/podiums
  • 2
    A/650/8919Cutting, drilling and shaping construction related materials in the workplace

    Unit Endorsements:

    Four of the following endorsements required:

  • Composites
  • Plastic
  • Masonry
  • Vitreous clay
  • Metal
  • Timber and timber based
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    H/650/8920Laying, placing or applying construction related materials in the workplace

    Unit Endorsements:

    Three of the following endorsements required:


  • Top soil or subsoil
  • Granular fill
  • Cohesive fill
  • Concrete
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    J/650/8921Preparing and mixing construction related materials in the workplace

    Unit Endorsements:

    Two of the following endorsements required:

  • Cementitious
  • Resins
  • Adhesives
  • Bonding agents
  • Colourings
  • Waterproof coatings
  • Grouts
  • Pre-mixed compounds
  • 1
    T/650/8908Installing, maintaining and removing temporary excavation support in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • A proprietary system
  • Open and closed support systems
  • Piling systems
  • Bespoke support systems
  • 2
    K/650/8922Identifying and marking the location of utilities apparatus and sub-structures in the workplace2
    M/651/0029Preparing and operating forward tipping dumpers to receive, transport and discharge materials in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Forward tipping dumper wheeled
  • Forward tipping dumper tracked
  • 2
    Y/651/0030Preparing and operating ride-on rollers to compact materials in the workplace

    Unit Endorsements:

  • Ride-on roller
  • 2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    F/503/1171Moving, handling and storing resources in the workplace2
    R/508/6532Controlling, directing and guiding the operation of plant or machinery in the workplace

    Unit Endorsements:

  • Operations Guide Banksman
  • 2
    J/618/8498Installing, constructing, maintaining, dismantling and removing temporary works in the workplace

    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)


    Plus four or more of the following:


  • Protective screens, hoardings and covers
  • Access and egress routes
  • Supports
  • Supporting structures
  • Removal equipment
  • Diverting equipment
  • Site facilities
  • Stabilisation
  • 2
    L/650/8923Locating and excavating to expose buried utility services in the workplace2

    Mandatory units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    A/651/0031Placing and finishing concrete in the workplace2
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    D/651/0032Erecting and striking proprietary formwork in the workplace2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2
    Optional units
    Candidates must complete ONE optional unit.
    Unit Ref.TitleLevel
    K/650/8913Preparing, mixing and distributing concrete and mortars in the workplace1
    K/651/0027Reinstating ground condition in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Backfill (excavated materials)
  • Backfill (new materials)
  • Compact
  • Hard top surfaces
  • Cultivated and grassed areas
  • 2
    D/615/4986Placing and compacting concrete in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

    Chute; Elephant’s Trunk; Skip; Pump; Mono-rail; Manually
    2
    D/600/8281Erecting and dismantling access/working platforms in the workplace

    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)

    Plus two or more of the following:

  • Ladders/crawler boards
  • Step ladders/platform steps
  • Proprietary towers
  • Trestle platforms
  • Mobile scaffold towers
  • Proprietary staging/podiums
  • 2
    A/650/8919Cutting, drilling and shaping construction related materials in the workplace

    Unit Endorsements:

    Four of the following endorsements required:

  • Composites
  • Plastic
  • Masonry
  • Vitreous clay
  • Metal
  • Timber and timber based
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    H/650/8920Laying, placing or applying construction related materials in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Top soil or subsoil
  • Granular fill
  • Cohesive fill
  • Concrete
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    J/650/8921Preparing and mixing construction related materials in the workplace

    Unit Endorsements:

    Two of the following endorsements required:

  • Cementitious
  • Resins
  • Adhesives
  • Bonding agents
  • Colourings
  • Waterproof coatings
  • Grouts
  • Pre-mixed compounds
  • 1
    T/650/8908Installing, maintaining and removing temporary excavation support in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • A proprietary system
  • Open and closed support systems
  • Piling systems
  • Bespoke support systems
  • 2
    K/650/8922Identifying and marking the location of utilities apparatus and sub-structures in the workplace2
    M/651/0029Preparing and operating forward tipping dumpers to receive, transport and discharge materials in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Forward tipping dumper wheeled
  • Forward tipping dumper tracked
  • 2
    Y/651/0030Preparing and operating ride-on rollers to compact materials in the workplace

    Unit Endorsements:

    Ride-on roller
    2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    F/503/1171Moving, handling and storing resources in the workplace2
    R/508/6532Controlling, directing and guiding the operation of plant or machinery in the workplace

    Unit Endorsements:

    Operations Guide Banksman
    2
    J/618/8498Installing, constructing, maintaining, dismantling and removing temporary works in the workplace

    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)


    Plus four or more of the following:

  • Protective screens, hoardings and covers
  • Access and egress routes
  • Supports
  • Supporting structures
  • Removal equipment
  • Diverting equipment
  • Site facilities
  • Stabilisation
  • 2
    L/650/8923Locating and excavating to expose buried utility services in the workplace2

    Mandatory units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2
    F/503/1171Moving, handling and storing resources in the workplace2
    Optional units group 1
    Candidates must complete one unit.
    Unit Ref.TitleLevel
    D/615/4986Placing and compacting concrete in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

    Chute; Elephant’s Trunk; Skip; Pump; Mono-rail; Manually
    2
    H/651/0016Installing drainage in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Inspection chambers
  • Surface water systems
  • Foul water systems
  • Surround pipe with specified materials
  • Place backfill to trench using given work instructions for both compacted and free drainage materials
  • 2
    Optional units group 2
    Candidates must complete one unit.
    Unit Ref.TitleLevel
    K/650/8913Preparing, mixing and distributing concrete and mortars in the workplace1
    K/651/0027Reinstating ground condition in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Backfill (excavated materials)
  • Backfill (new materials)
  • Compact
  • Hard top surfaces
  • Cultivated and grassed areas
  • 2
    D/600/8281Erecting and dismantling access/working platforms in the workplace

    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)

    Plus two or more of the following:

  • Ladders/crawler boards
  • Step ladders/platform steps
  • Proprietary towers
  • Trestle platforms
  • Mobile scaffold towers
  • Proprietary staging/podiums
  • 2
    A/650/8919Cutting, drilling and shaping construction related materials in the workplace

    Unit Endorsements:

    Four of the following endorsements required:

  • Composites
  • Plastic
  • Masonry
  • Vitreous clay
  • Metal
  • Timber and timber based
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    H/650/8920Laying, placing or applying construction related materials in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Top soil or subsoil
  • Granular fill
  • Cohesive fill
  • Concrete
  • Cementitious
  • Bituminous
  • Geotextiles
  • 1
    J/650/8921Preparing and mixing construction related materials in the workplace

    Unit Endorsements:

    Two of the following endorsements required:

  • Cementitious
  • Resins
  • Adhesives
  • Bonding agents
  • Colourings
  • Waterproof coatings
  • Grouts
  • Pre-mixed compounds
  • 1
    T/650/8908Installing, maintaining and removing temporary excavation support in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • A proprietary system
  • Open and closed support systems
  • Piling systems
  • Bespoke support systems
  • 2
    K/650/8922Identifying and marking the location of utilities apparatus and sub-structures in the workplace2
    M/651/0029Preparing and operating forward tipping dumpers to receive, transport and discharge materials in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Forward tipping dumper wheeled
  • Forward tipping dumper tracked
  • 2
    Y/651/0030Preparing and operating ride-on rollers to compact materials in the workplace

    Unit Endorsements:

  • Ride-on roller
  • 2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    R/508/6532Controlling, directing and guiding the operation of plant or machinery in the workplace

    Unit Endorsements:

  • Operations Guide Banksman
  • 2
    J/618/8498Installing, constructing, maintaining, dismantling and removing temporary works in the workplace

    Unit Endorsements:

  • Own area of work (i.e. Construction and Civil Engineering Operations)


  • Plus four or more of the following:

  • Protective screens, hoardings and covers
  • Access and egress routes
  • Supports
  • Supporting structures
  • Removal equipment
  • Diverting equipment
  • Site facilities
  • Stabilisation
  • 2
    L/650/8923Locating and excavating to expose buried utility services in the workplace2

    Mandatory units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required

  • Protection and safety notices
  • Safety lighting
  • 2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2
    Optional units
    Candidates must complete one unit.
    Unit Ref.TitleLevel
    A/651/0031Placing and finishing concrete in the workplace2
    H/651/0016Installing drainage in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Inspection chambers
  • Surface water systems
  • Foul water systems
  • Surround pipe with specified materials
  • Place backfill to trench using given work instructions for both compacted and free drainage materials
  • 2

    Mandatory units
    Candidates must complete all mandatory units.
    Unit Ref.TitleLevel
    K/651/0027Reinstating ground condition in the workplace

    Unit Endorsements:

    Three of the following endorsements required:

  • Backfill (excavated materials)
  • Backfill (new materials)
  • Compact
  • Hard top surfaces
  • Cultivated and grassed areas
  • 2
    J/617/1197Installing, maintaining and removing work area protection and safety equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Protection and safety notices
  • Safety lighting
  • 2
    M/650/8924Forming and finishing excavations manually in the workplace2
    M/508/6537Conforming to general health, safety and welfare in the workplace1
    T/508/6538Conforming to productive working practices in the workplace2
    Optional units
    Candidates must complete one unit.
    Unit Ref.TitleLevel
    K/650/8922Identifying and marking the location of utilities apparatus and sub-structures in the workplace2
    D/651/0014Preparing and operating powered units, tools or pedestrian plant, machinery or equipment in the workplace

    Unit Endorsements:

    One of the following endorsements required:

  • Generators
  • Pumps
  • Pedestrian operated plant or machines
  • Mixers
  • Compressors
  • Self-powered tools
  • 2
    R/508/6532Controlling, directing and guiding the operation of plant or machinery in the workplace

    Unit Endorsements:

  • Operations Guide Banksman
  • 2
    L/650/8923Locating and excavating to expose buried utility services in the workplace2

    Frequently Asked Questions

    Do you have questions about this NVQ? Here is a compilation of our most frequently asked questions.

    Groundworks refer to the construction work that takes place before the construction of a building, such as site preparation, excavation, and foundation work. It involves the construction of the foundations and substructure of buildings, roads, and other structures.

    The Construction Operations Level 2 NVQ covers a range of topics related to groundworks and civil engineering construction operations, including site preparation and setup, excavation and earthworks, concreting, drainage, and health and safety.

    The Construction Operations Level 2 NVQ is aimed at individuals who are working in the construction industry and wish to develop their skills and knowledge in groundworks and civil engineering construction operations. It is suitable for those who are working in roles such as groundworker, plant operator, and general construction operative.

    Completing the Construction Operations Level 2 NVQ can provide individuals with a range of benefits, including enhanced job prospects, improved earning potential, and the ability to progress to higher levels of study and qualifications. It can also help to ensure that individuals have the necessary skills and knowledge to work safely and effectively in the construction industry.

    The Construction Operations Level 2 NVQ is assessed onsite using various methods of assessment, such as direct observation, question sessions, and the collection of relevant documentation. Learners will be required to demonstrate their knowledge and skills in a range of areas related to groundworks and civil engineering construction operations.

    Yes, you can be eligible for the CSCS Blue Skilled Workers card as long as you have completed the relevant Operative Health and Safety Test within 2 years of applying for the card. Please contact Workforce Skills Support for further CSCS experienced and trainee card information.

    Learn more
    The perfect choice for your career
    Delegates who completed this qualification report an increase in career opportunities and advancements.
    Need more training support?
    Get in touch with our friendly and knowledgeable team today.
    Is your company levy registered?
    Are you happy to be contacted for marketing?*
    wss logo circle
    newsletter
    Get notified by subscribing our newsletter
    Stay up to date to our latest construction training news & articles