Workforce Skills Support

Sub Structure Work Occupations – Level 2 NVQ

About the NVQ

Qualification Title

L2 NVQ Diploma in Sub - Structure Work Occupations

Occupation

Sub - Structure Work Occupations
This Level 2 NVQ is aimed at candidates in the construction industry working in a spcific job roles.

Pathways

Pathway 1 Underpinning Operations – Excavated Underpinning
Pathway 2 Underpinning Operations – Underpinning Piling
Pathway 3 Chemical and Resin Grouting
Pathway 4 Retaining Structures
Pathway 5 Dewatering – Well Points
Pathway 6 Dewatering – Deep Wells
Pathway 7 Dewatering – Ejectors
Pathway 8 Ground Anchors – Driven
Pathway 9 Ground Anchors – Open Hole
Pathway 10 Ground Anchors – Self-drilling
Pathway 11 Box Beam Post Tensioning
Pathway 12 Installation of Gas Membranes
Pathway 13 Structural Waterproofing
Pathway 14 Basement Construction – Underpinning Operations – Excavated
Underpinning Operations
Pathway 15 Basement Construction – Underpinning Operations – Underpinning Piling
Pathway 16 Basement Construction – Chemical and Resin Grouting
Pathway 17 Basement Construction – Retaining Structures
Pathway 18 Basement Construction – Dewatering – Well Points
Pathway 19 Basement Construction – Dewatering – Deep Wells
Pathway 20 Basement Construction – Dewatering – Ejectors
Pathway 21 Basement Construction – Ground Anchors – Driven
Pathway 22 Basement Construction – Ground Anchors – Open Hole
Pathway 23 Basement Construction – Ground Anchors – Self-drilling
Pathway 24 Basement Construction – Box Beam Post Tensioning
Pathway 25 Basement Construction – Installation of Gas Membranes
Pathway 26 Basement Construction – Structural Waterproofing

Pathway 1: Underpinning Operations – Excavated Underpinning

Candidates must complete NINE units:
• FOUR Mandatory units
• ONE unit from Optional unit Group A
• FOUR units from Optional unit Group B
enquire about this NVQ

Pathway 2: Underpinning Operations – Underpinning Piling

Candidates must complete SEVEN units:
• SIX Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 3: Chemical and Resin Grouting

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 4: Retaining Structures

Candidates must complete SEVEN units:
• SIX Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 5: Dewatering – Well Points

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 6: Dewatering – Deep Wells

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 7: Dewatering – Ejectors

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 8: Ground Anchors – Driven

Candidates must complete FIVE Mandatory units.
enquire about this NVQ

Pathway 9: Ground Anchors – Open Hole

Candidates must complete FIVE Mandatory units.
enquire about this NVQ

Pathway 10: Ground Anchors – Self Drilling

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 11: Box Beam Post Tensioning

Candidates must complete SIX Mandatory units.
enquire about this NVQ

Pathway 12: Installation of Gas Membranes

Candidate must complete FIVE Mandatory units.
enquire about this NVQ

Pathway 13: Structural Waterproofing

Mandatory Units

Candidates must complete SIX units:
• FIVE Mandatory units
• ONE Optional units
enquire about this NVQ

Pathway 14: Basement Construction – Excavated Underpinning Operations

Mandatory Units

Candidates must complete ELEVEN units:
• SIX Mandatory units
• ONE unit from Optional Group A
• FOUR units from Optional Group B
enquire about this NVQ

Pathway 15: Basement Construction – Underpinning Piling

Mandatory Units

Candidates must complete NINE units:
• EIGHT Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 16: Basement Construction – Chemical and Resin Grouting

Mandatory Units

Candidates must complete EIGHT units:
• SEVEN Mandatory units
• ONE Optional unit
enquire about this NVQ

Pathway 17: Basement Construction – Retaining Structures

Mandatory Units

Candidates must complete NINE units:
• EIGHT Mandatory units
• ONE Optional unit
enquire about this NVQ
Acclaim Accredited
Proqual Accredited
Armed Forces Covenant Accredited
SQA Accredited
CONSTRUCTIONLINE Accredited
CITB Accredited
NPORS Accredited
IATP Accredited
ACAD Accredited
Bita Accredited
Join Our Mailing List
SUBSCRIBE
envelope linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram